Modest gray ranch home with a snow-covered front yard, shoveled walk, and attached garage in clear winter afternoon light.

The Boyne City Trail Ends at Horton Bay for Now, and the Next Six Miles Are a Fundraising Project

Last November 21, 65 people gathered at Horton Bay Community Church to cut a ribbon on a strip of pavement that had been finished since spring. The ceremony formally opened Phase 3 of the Boyne City to Charlevoix Trail. That gave Boyne City an unbroken paved route from the corner of W. Michigan Avenue and Boyne City Road, west along Lake Charlevoix, to the village of Horton Bay.

This is that route's second winter. It is also the second winter in which the path to Charlevoix stops at the western edge of Horton Bay. The Top of Michigan Trails Council counts 8.37 miles of the planned 14.36 as built. The work holding up the rest is engineering and surveying, and that work moves only as fast as donations arrive.

What the Boyne City end looks like on the ground

Charlevoix County describes the trail as a paved path 10 feet wide that runs alongside Boyne City Road but is mostly separate from it. Heading west out of town, here is what you pass:

  1. W. Michigan Avenue and Boyne City Road. Phase 1 starts here and stays on the Lake Charlevoix side of the road.
  2. Young State Park. The trail runs through the park on an easement. The park covers 563 acres and has 6.5 miles of its own trails.
  3. N. Springwater Beach Road. This is the Evangeline/Bay Township line, where Phase 1, completed in 2016, ends and Phase 3 begins.
  4. The separated lakeside stretch through Bay Township. The path stays detached from the road until just east of Horton Bay.
  5. Horton Bay village. Because the homes sit close to the road, the route uses the road's 6-foot paved shoulders here, with crosswalks and signs. Lake Street leads down to a public beach on Lake Charlevoix with benches. The Horton Bay General Store and the Red Fox Inn are both on the route.
  6. The end of the pavement. Phase 3 stops just east of the entrance to the Rufus Teesdale Preserve.

Molly McCoy and Greg Cummings have been stewards of the Horton Bay General Store since 2022, and its website lists coffee and espresso, pastries, sandwiches, beer and wine, and picnic supplies. The Red Fox Inn is a bookstore that opens seasonally. The Rufus Teesdale Preserve where the pavement ends is a 10-acre Little Traverse Conservancy property on Horton Creek. The Conservancy lists it among its preserves without formal parking or trails, so it works better as a landmark than as a place to hike.

The winter rules are short

The county keeps the trail open all year and names walking, biking, skating, skiing and snowshoeing as allowed uses. It also says plainly that the trail is not maintained or groomed in winter. Snowmobiles and horses are not allowed in any season. From December to March, the path is whatever the last storm left on it.

Young State Park lists cross-country skiing and snowshoeing among its activities. Under Michigan DNR rules, state park day-use hours are 8 a.m. to 10 p.m. The Recreation Passport is required only for vehicles. Anyone who arrives on foot or by bike is exempt, so walking or skiing in from town costs nothing.

Where the gap is

The Charlevoix end of the trail was built early. Phase 2, constructed in 2017, starts at the Little Traverse Wheelway in Hayes Township east of Waller Road. It crosses US-31, uses easements to reach Boyne City Road east of the Argonne Supper Club, and follows the Susan Lake side of the road to Quarterline Road. A spur off it leads to Eastern Avenue, which runs down to a public Lake Charlevoix access with a picnic area and swimming beach.

The missing piece runs between Quarterline Road and the Rufus Teesdale entrance. Two phases are drawn to meet at one future trailhead:

Segment Runs from Runs to Side of Boyne City Road Status
Phase 1 W. Michigan Ave., Boyne City N. Springwater Beach Rd. Lake Charlevoix side Completed 2016
Phase 3 N. Springwater Beach Rd. West edge of Horton Bay Lake Charlevoix side Opened Nov. 2025
Phase 5 Rufus Teesdale entrance near Pincherry Rd. Hayes Township Park Lake Charlevoix side Planned, 3.3 miles
Phase 4 Hayes Township Park Quarterline Rd. North side, away from the lake Planned, 2.69 miles
Phase 2 Quarterline Rd. Little Traverse Wheelway, Hayes Township Susan Lake side Constructed 2017

The meeting point is Hayes Township Park, formerly Camp Sea-Gull. A trailhead is planned there, and that is also where the route would cross Boyne City Road. Once the gap is closed, the trail would connect Boyne City to the Little Traverse Wheelway toward Charlevoix, Petoskey and Harbor Springs, and to the Boyne Valley Trailway.

Planners first drew the last six miles as two separate engineering and construction projects. To save money, organizers combined the engineering into one plan, though construction may still happen in two phases.

Why the next milestone is a dollar figure

Every built phase of this trail cost more than the one before. The Boyne Citizen reported these totals:

  • Phase 1, Boyne City to N. Springwater Beach Road: $1,182,566, finished in 2016
  • Phase 2, Charlevoix to Quarterline Road: $1,323,950, finished in 2017
  • Phase 3, N. Springwater Beach Road to Horton Bay: $1,648,569

The same report said private donations and local and state grants have paid for 93 percent of the project. Charlevoix County has put in about $282,000 so far. Most of the trail Boyne City uses today was paid for by donors and grants.

The remaining work follows the same funding pattern, starting earlier in the process. Earlier in 2026, the Charlevoix County Trail Team reached a $50,000 fundraising goal and hired the engineering firm Wade Trim to begin surveying and grant research. In May, the Petoskey News-Review reported that Wade Trim was under contract to find the best route for the last six miles between Horton Bay and the outskirts of Charlevoix.

In October, John and Diane Harris of Petoskey pledged $30,000 on one condition. The Top of Michigan Trails Council and the Charlevoix County Trail Team have to raise another $30,000 to match it. The money goes toward an overall engineering and surveying goal of $290,000. The trail team has raised $100,000 over the past year, according to the Boyne Citizen. Project leaders Bob McLain and Steve Van Dam told that paper that every new donation now counts toward the match.

"By matching the $30k we will be able to continue working toward finishing the survey and starting the engineering process," McLain told the Boyne Citizen. Van Dam added that meeting the match would put the team "more than halfway to our goal."

Becca Nelson, interim executive director of the Trails Council, described how it works in the same Boyne Citizen report:

"Volunteers and community groups help raise the money needed to get trail projects shovel-ready, and eligible for larger state grants that support construction."

Donor money pays for the survey. The survey and engineering make the project "shovel-ready." Being shovel-ready lets it compete for the large state grants that paid for most of Phases 1 through 3. The Harris match sits at the first step. The Trails Council describes the remaining six miles as work that "can only happen at the speed of funding."

What this winter on the trail looks like

The finished part runs from Boyne City through Young State Park to the shoulders through Horton Bay. It is open, unplowed, and closed to snowmobiles. Walking, biking, skiing or snowshoeing into Young costs nothing. In Horton Bay, the turn down Lake Street leads to a beach with benches facing the water, and the pavement ends at the Rufus Teesdale entrance. The six miles past that point depend on the $30,000 match, which the Top of Michigan Trails Council is taking donations for now.

When a trail like this gets close to a property, it changes what buyers ask about, starting with distance to the nearest access point and which side of Boyne City Road the path runs on. At Davis Labelle, I track projects like the Hayes Township Park trailhead because buyers along this corridor ask about them. If you own or are considering a property between Boyne City and Charlevoix and want to know how the planned segments line up with it, schedule a free consultation.

Let’s Make Your Next Move the Right One

I combine data-driven insight with a practical understanding of lifestyle and land value to help my clients make smart, confident real estate decisions. Whether you’re buying a home, acquiring property, or evaluating an investment, I provide clear guidance, strong negotiation, and steady support from start to finish.

Follow Me on Instagram